Saturday, June 23, 2012

WYEE at Thornleigh

This is the 3rd private exibition layout the owner  has Displayed his first was  Time and Patience  2nd. A Tractiv Effort and now 3.Wyee

Monday, June 11, 2012

Motorised Home signal HO

Bought some of these signals at the Epping model railway show to put on my layout now just have to source the motor (with bounce) from the UK apparently.If anyone knows where they are available???

Saturday, June 2, 2012

NORTH137and142 photos

Numbered pictures correspond with arrows on previous post

1.The run up to Hawkemount /down to Tickhill tunnel with
single track the Wangi branch turn back .

2.North Awaba near the Cessnock rd bridge ,
refuge loop on right and
backplatform road onto Wangi

3.Newstan Colliery sidings and loading bins.
Single track joins mainline at Nth Fassifern

4.View looking towards Fassifern from where Wakefield rd bridge will be.
Newstan branch joins Mainline near lattice signal post.Coal trains can
 leave and return to here/Newstan without stopping via Wangi turnback.
5.Hawkemount



6.Fassifern crossover from Toronto Branch.
7.Wangi turnback below with 4201 running light into Fassifern

8.Toronto Station,yard with parachute water tank and goods shed

9.The run uphill between Awaba and south Fassifern with passing loop
 on the down and cement siding (program track)
Area unnamed


 

 

Friday, June 1, 2012

NORTH137and142 line drawing

All the track has been layed scenery and buildings and structures in
 progress size 5.5m x 5.5m